MITRE WHARF 4D

What if we added one floor?

Test one change before it becomes a cost, a delay or a claim. This film is the visual answer: what one added floor actually asks of the project.

Products & capabilities used →

The change, revealed

This is the visual answer to the question: one added floor, revealed against the existing condition.

The same building, before and after

Drag the divider to move between the existing condition and the proposed added floor. The governed figures sit on either side, shown as recorded.

Existing Mitre Wharf structural model before the change.Proposed Mitre Wharf structural model with one added floor.

Left of the divider: existing. Right of the divider: proposed.

EXISTING

PACKAGE TOTAL, 17 PACKAGES
£7,236,810DIRECTEDStructure package summary, 17 packages
BCIS BENCHMARK
£2,110–£2,350/m²VERIFIEDBCIS functional benchmark for flats and apartments
TENDER PRICE INDEX
226VERIFIEDBCIS tender price index

ADDITIONAL

PROGRAMME
+15 WORKING DAYSVERIFIEDGoverned RC-frame programme baseline
GIFA ADDED
1,222 m²VERIFIEDGoverned area schedule, added levels
SPACE EFFICIENCY
80.98%VERIFIEDSpace efficiency on the added area
STRUCTURE
£598,780DIRECTEDWithin governed subcontractor range £487–£494/m²
STRUCTURE AS A PROPORTION OF BENCHMARKED COST
22.0%DIRECTEDStructure over benchmarked cost, added storey
NET SELLABLE
≈ 990 m²DERIVEDAdded GIFA at the stated space efficiency

What the change touches

The consequence view: layers separated to show what the change touches.

The causal trace

One intervention → governed consequences.

Evidence and decision gate

Every figure is shown with its status and a plain description. Nothing here is arithmetic; the values are recorded literals.

Governed figures with their status and public description
MetricFigureStatusNote
EXISTING
PACKAGE TOTAL, 17 PACKAGES£7,236,810DIRECTEDStructure package summary, 17 packages
BCIS BENCHMARK£2,110–£2,350/m²VERIFIEDBCIS functional benchmark for flats and apartments
TENDER PRICE INDEX226VERIFIEDBCIS tender price index
ADDITIONAL
PROGRAMME+15 WORKING DAYSVERIFIEDGoverned RC-frame programme baseline
GIFA ADDED1,222 m²VERIFIEDGoverned area schedule, added levels
SPACE EFFICIENCY80.98%VERIFIEDSpace efficiency on the added area
STRUCTURE£598,780DIRECTEDWithin governed subcontractor range £487–£494/m²
STRUCTURE AS A PROPORTION OF BENCHMARKED COST22.0%DIRECTEDStructure over benchmarked cost, added storey

Before you commit, review:

SOURCE
What evidence is this based on?
SCOPE
What is included and excluded?
BASIS
Which assumptions and benchmarks apply?
CAPACITY
Can the project absorb the consequence?

AWAITING ENGINEER APPROVAL

One change. Every consequence. Before you commit.

BRING US ONE LIVE PROJECT DECISION.