← Back to evidence

Stadium / leisure

Stadium, Saudi Arabia

Engineering an international competition-winning proposal

Stadium / leisureCompetitionSaudi Arabia

Excavated stadium bowl with earthworks plant and tower cranes on a desert site.

The decision

Problem

Could an extraordinary architectural concept on a highly constrained cliffside site become a credible competition proposal?

Evidence

Site investigation constraints, cliff-edge temporary works, rock support and foundation options.

Analysis

Geotechnical and civil engineering input integrated with constructability, cut-and-fill earthworks and programme thinking.

Decision

Engineering and constructability developed into the competition submission.

Consequence

The international design competition was won.

Outcomes

  • Engineering and constructability input carried into a competition-winning submission.
  • Foundation, cliff-edge temporary works and earthworks strategy developed together.
  • Design decisions tested for buildability before they were committed.

Example deliverables

Anonymised examples of the outputs this kind of decision produces.

Detailed bill of quantities example with measured items and rates.
Programme chart example showing activities sequenced against time.
Diagram mapping a project embryo through successive stages to the deliverables produced.
Anonymised project programme example showing sequencing and consequence evidence.